The moving floor consists of a series of longitudinal aluminum beams that are hydraulically driven. The drive is three-sectioned. Each section of beams is operated by its own hydraulic cylinder. The beams perform reciprocating movements in the longitudinal direction. During unloading and loading, all beam sections move simultaneously (beam travel is 200 mm). On the return stroke, the sections move sequentially. The cycles then repeat and the cargo is moved. The total unloading time is 15 minutes.
There is no risk of the semi-trailer tipping over during unloading, compared to semi-trailers with a tipping body lift. Loading and unloading are performed horizontally, so relative unevenness and unstable ground at unloading sites are not dangerous. Unloading can be carried out in premises with ceiling heights only slightly higher than the semi-trailer itself (low warehouses, factory workshops, timber processing plants). Full control of the hydraulic system is provided by a manual remote control panel. The moving floor design does not require any scheduled technical maintenance during operation. Loading and unloading can be performed without using a forklift inside the body.
Suspensiondependent, on longitudinal elastic arms with pneumatic elastic elements and telescopic hydraulic shock absorbers
Advantages:
Aluminum body
Aluminum swing rear doors
New platform on front board
New tarpaulin/tension design
Lightweight frame design
Other Specifications:
Rear wallaluminum swing gates
Floorsliding floor system
Support devicefor 24 tons
Body volume, cu.m89
Side wallsmade of aluminum profile
Moving Floor Semi-Trailer Tonar SDP4-89
The moving floor consists of a series of longitudinal aluminum beams that are hydraulically driven. The drive is three-sectioned. Each section of beams is operated by its own hydraulic cylinder. The beams perform reciprocating movements in the longitudinal direction. During unloading and loading, all beam sections move simultaneously (beam travel is 200 mm). On the return stroke, the sections move sequentially. The cycles then repeat and the cargo is moved. The total unloading time is 15 minutes.
There is no risk of the semi-trailer tipping over during unloading, compared to semi-trailers with a tipping body lift. Loading and unloading are performed horizontally, so relative unevenness and unstable ground at unloading sites are not dangerous. Unloading can be carried out in premises with ceiling heights only slightly higher than the semi-trailer itself (low warehouses, factory workshops, timber processing plants). Full control of the hydraulic system is provided by a manual remote control panel. The moving floor design does not require any scheduled technical maintenance during operation. Loading and unloading can be performed without using a forklift inside the body.
Сегодня выиграет тот, кто сможет перейти на российские детали и комплектующие. Это залог стабильности и конкурентной цены, не зависящей от скачков курса.
Yuri Pavlovich WeinsteinFounder and technical director of the plant